Order Helpline 01752 692 760
Order Helpline 01752 692 760

Type X Catchment Tray RH 23.5dg Long Lead

Code:
CR 23.5 T 4

This right-handed Type X Catchment Tray by Cavity Trays is a specialised solution that goes beyond the typical intermediate tray design. Distinguished by upstands on both ends, this 23.5° tray plays a crucial role in preventing dampness within internal skins, actively defendin... Read More

£18.01 Incl. VAT
Earn points

SUPER Rewards Earn points and build more across our SUPERSTORES!

Find out more
Oops! Please select from the options
Est. Delivery: 3-5 Working Days
Shipping costs displayed in basket.
We can let you know when this product is back in stock.

This product is proving to be very popular and has unfortunately sold out.

Enter your email below and we'll notify you as soon as this product is back in stock:

For delivery Monday, Dec 30th - order in:
days hrs mins secs
Subject to stock availability, if products on a 24 hours service are ordered alongside products NOT on a 24 hours service, this may delay your whole order.
View Transport Policy

All delivery charges are included in the final shopping basket and are dependent on the products Scottish Highlands & the Islands where additional shipping charges will apply.

Please note that not all products will incur an additional delivery charge to the Scottish Highlands & the Islands – this is based on the costs from the manufacturer, distributor or courier providing shipping on our behalf. If your delivery address is in the Scottish Highlands and Islands, a member of our helpline team will contact you prior to processing your order should an additional delivery charge apply.

While we make every effort to ensure orders are delivered by the date required, we cannot guarantee availability from the manufacturer or the manufacturer's delivery schedules.

Any variation to web delivery date given will be advised to you by email or telephone. If we are unable to make delivery because access is not possible, we reserve the right to make a failed delivery charge.

Create a wishlist

"Ordering was simple"

W Eldridge

Description

This right-handed Type X Catchment Tray by Cavity Trays is a specialised solution that goes beyond the typical intermediate tray design. Distinguished by upstands on both ends, this 23.5° tray plays a crucial role in preventing dampness within internal skins, actively defending your roofing system's structural integrity. Crafted with precision, its primary function is to efficiently receive water from intermediate trays and seamlessly discharge it through an integrated Caviweep, providing a robust water management solution.

Installation of the Type X Catchment Tray is a hassle-free process, ensuring convenience for both builders and homeowners. Built with unmatched durability, this tray is designed to withstand the elements, delivering long-lasting protection against potential water damage. Engineered to weatherproof critical intersections, including physical roof and masonry joints, the catchment tray elevates its performance to provide comprehensive shield and reliability.

Features & Benefits: Type X Catchment Tray RH 23.5dg Long Lead

  • Prevents dampness from penetrating below the critical stepped roof
  • Externally weatherproofs and flashes the physical roof/masonry intersection
  • Right handed
  • 23.5° roof pitch

Details

Material Polypropylene Profile Universal Minimum Pitch 23.5 Degrees

Questions & Answers

There are currently no questions for this product.

loading...

Product Enquiry Form

Type X Catchment Tray RH 23.5dg Long Lead

*Required Field